I’m in Nashville visiting family, so Darryl went to Glacier Bear Retreat today to see the latest progress. Here are a few shots showing the new chimney and the back deck. The framing is moving forward and almost 1/2 of the roof is now sheeted!
The roofer starts installing the shingles next Monday- in 3 days- finally. I’ll feel better once the roof is installed.
Next Wednesday the doors and windows arrive, so by the end of next week, the house should be dried in for the winter. The following week the exterior siding will be installed, so by the end of October, we should be ready for winter.
At that point, then we can concentrate on the interior!
![House On 10/11 Looking From The South Side Img_6405](https://glacierbearretreat.com/wp-content/uploads/2013/10/IMG_6405-300x261.jpg)
![The Rear Deck - Home Of The Future Screened In Porch, And The New Chimney Img_8611](https://glacierbearretreat.com/wp-content/uploads/2013/10/IMG_8611-225x300.jpg)
This Post Has One Comment